Regel 10: | Regel 10: | ||
}} |
}} |
||
<imagemap> |
<imagemap> |
||
− | File:Ecoblocks v20160301.jpeg|center| |
+ | File:Ecoblocks v20160301.jpeg|center|900px|Ecoblocks v20160301 |
rect 908 1473 1236 1539 [[Bfn Development guidlines Building for Nature applications]] |
rect 908 1473 1236 1539 [[Bfn Development guidlines Building for Nature applications]] |
||
rect 1095 1621 1320 1687 [[Bfn Practical guide ecological design]] |
rect 1095 1621 1320 1687 [[Bfn Practical guide ecological design]] |
||
− | rect |
+ | rect 554 577 876 643 [[Bfn Design ecoblock revetments with stakeholders]] |
− | rect |
+ | rect 602 899 827 965 [[Bfn Data collection ecoblock revetments]] |
− | rect |
+ | rect 561 342 868 408 [[Bfn Literature review and interviews ecoblock revetments]] |
− | rect |
+ | rect 613 1065 817 1131 [[Bfn Data analysis ecoblock revetments]] |
− | rect |
+ | rect 602 789 827 855 [[Bfn Production and placing ecoblock revetments]] |
− | rect |
+ | rect 232 711 500 750 [[Bfn Design ecoblock revetments]] |
− | rect |
+ | rect 253 459 478 525 [[Bfn Knowledge gaps ecoblock revetments]] |
− | rect |
+ | rect 241 1000 491 1039 [[Bfn Data ecoblock revetments]] |
− | rect |
+ | rect 602 1203 827 1269 [[Bfn Conclusions ecoblock revetments]] |
− | + | rect 180 302 884 1278 [[Bfn Designing and researching ecoblock revetments]] |
|
− | rect 180 302 |
||
rect 180 1350 487 1416 [[Bfn Designing and researching ecological potential mastic asphalt]] |
rect 180 1350 487 1416 [[Bfn Designing and researching ecological potential mastic asphalt]] |
||
rect 180 1621 505 1687 [[Bfn Desiging and researching ecological potential foreshore rubble]] |
rect 180 1621 505 1687 [[Bfn Desiging and researching ecological potential foreshore rubble]] |
||
Regel 32: | Regel 31: | ||
rect 77 62 1337 1860 [[Bfn Building for Nature project]] |
rect 77 62 1337 1860 [[Bfn Building for Nature project]] |
||
</imagemap> |
</imagemap> |
||
+ | |||
{{VN query}} |
{{VN query}} |
||
{{Activity links |
{{Activity links |
Bfn Designing and researching ecoblock revetments | |
---|---|
Context | Bfn Building for Nature project |
Decompositie type | IOR |
Activity
The research and design of the revetment was achieved in two phases. The first phase comprised a literature study of similar projects, see this page. This literature study is used as input for the second phase and also on the methodology to evaluate the results. In the second phase workshops were organized with a group of experts with different backgrounds to analyze and define the final designs. The revetment blocks were later applied in the intertidal zone on a frame (Yerseke) and at a dyke revetment (Sint Annaland site).
For an overview of the ecological developement at the Dike at Sint-Annaland see this video
Omroep Zeeland made a news item (in Dutch) about the ecological developments of the dikes: see here.
De View-Navigation (VN) pagina's.
De links naar andere pagina's.
Produceert | |
---|---|
Consumeeert | |
Onderdeel van | Bfn Researching and designing solid dike revetments to increase natural values |
Instantie van | |
Betreft |
De pagina's die linken naar deze pagina.
Bestaat uit | Type |
---|---|
Bfn Conclusions ecoblock revetments | Outcome |
Bfn Data analysis ecoblock revetments | Activity |
Bfn Data collection ecoblock revetments | Activity |
Bfn Data ecoblock revetments | Outcome |
Bfn Design ecoblock revetments | Outcome |
Bfn Design ecoblock revetments with stakeholders | Activity |
Bfn Knowledge gaps ecoblock revetments | Outcome |
Bfn Literature review and interviews ecoblock revetments | Activity |
Bfn Production and placing ecoblock revetments | Activity |
Naar dit element wordt niet geconnecteerd.