Bfn Design foreshore rubble with stakeholders: verschil tussen versies

 
(2 tussenliggende versies door dezelfde gebruiker niet weergegeven)
Regel 8: Regel 8:
 
|Heading nl=Design foreshore rubble with stakeholders
 
|Heading nl=Design foreshore rubble with stakeholders
 
|Heading en=Design foreshore rubble with stakeholders
 
|Heading en=Design foreshore rubble with stakeholders
  +
}}
  +
{{Paragraph
  +
|Paragraph number=1
  +
|Paragraph language=Dutch-English
  +
|Paragraph=[[File:Ontwerp Schelphoek vooroever.jpg|thumb|center|600px|Final design of the sandstone/quartzite and limestone at the study location Schelphoek. The yellow lines show the location of the measurement profiles.]]
  +
  +
  +
[[File:Zijstorter.jpg|thumb|center|600px|One side-unloading barge on a ship, carrying the rip-rap to the location Schelphoek (source: De Vries en van de Wiel).]]
 
}}
 
}}
   

Huidige versie van 24 okt 2017 om 15:28

Bfn Design foreshore rubble with stakeholders
Context Bfn Building for Nature project
Decompositie type IOR

Activity



Final design of the sandstone/quartzite and limestone at the study location Schelphoek. The yellow lines show the location of the measurement profiles.


One side-unloading barge on a ship, carrying the rip-rap to the location Schelphoek (source: De Vries en van de Wiel).




De View-Navigation (VN) pagina's.


De links naar andere pagina's.

Produceert
Consumeeert
Onderdeel van Bfn Desiging and researching ecological potential foreshore rubble
Instantie van
Betreft


Connectie.

Connectie type seq
Connecteert naar Bfn Data analysis foreshore rubble
Conditie
Opmerkingen


De pagina's die linken naar deze pagina.

HZ University of Applied Sciences
Rijkswaterstaat, Ministerie van Infrastructuur en Milieu
Projectbureau Zeeweringen
Waterschap Scheldestromen
Provincie Zeeland
Deltares