Bfn Design foreshore rubble with stakeholders: verschil tussen versies

(Nieuwe pagina aangemaakt met '{{Activity |Context=Bfn Building for Nature project, |Intentional Element decomposition type=IOR }} {{Paragraphs show}} {{Beeldmateriaal show}} {{Heading |Heading e...')
 
Regel 6: Regel 6:
 
{{Beeldmateriaal show}}
 
{{Beeldmateriaal show}}
 
{{Heading
 
{{Heading
  +
|Heading nl=Design foreshore rubble with stakeholders
 
|Heading en=Design foreshore rubble with stakeholders
 
|Heading en=Design foreshore rubble with stakeholders
 
}}
 
}}

Versie van 1 mrt 2016 om 17:24

Bfn Design foreshore rubble with stakeholders
Context Bfn Building for Nature project
Decompositie type IOR

Activity



Final design of the sandstone/quartzite and limestone at the study location Schelphoek. The yellow lines show the location of the measurement profiles.


One side-unloading barge on a ship, carrying the rip-rap to the location Schelphoek (source: De Vries en van de Wiel).




De View-Navigation (VN) pagina's.


De links naar andere pagina's.


Connectie.

Connectie type seq
Connecteert naar Bfn Placing foreshore rubble
Conditie
Opmerkingen


De pagina's die linken naar deze pagina.

HZ University of Applied Sciences
Rijkswaterstaat, Ministerie van Infrastructuur en Milieu
Projectbureau Zeeweringen
Waterschap Scheldestromen
Provincie Zeeland
Deltares