Bfn Design ecoblock revetments with stakeholders

Bfn Design ecoblock revetments with stakeholders
Context Bfn Building for Nature project
Decompositie type IOR

Activity



The design of the ecoblocks was done taking in account the input of stakeholders on several workshops. This phase took place between November 2013 and February 2014 and later between November 2014 and April 2015. In these two periods eight design sessions where scheduled. During the workshops design considerations, ecological opportunities and production limitations were considered and incorporated in the final design.




De View-Navigation (VN) pagina's.


De links naar andere pagina's.

Produceert Bfn Design ecoblock revetments
Consumeeert
Onderdeel van Bfn Designing and researching ecoblock revetments
Instantie van
Betreft


Connectie.

Connectie type seq
Connecteert naar Bfn Production and placing ecoblock revetments
Conditie
Opmerkingen


De pagina's die linken naar deze pagina.

HZ University of Applied Sciences
Rijkswaterstaat, Ministerie van Infrastructuur en Milieu
Projectbureau Zeeweringen
Waterschap Scheldestromen
Provincie Zeeland
Deltares