Bfn Design ecoblock revetments with stakeholders | |
---|---|
Context | Bfn Building for Nature project |
Decompositie type | IOR |
Activity
The design of the ecoblocks was done taking in account the input of stakeholders on several workshops. This phase took place between November 2013 and February 2014 and later between November 2014 and April 2015. In these two periods eight design sessions where scheduled. During the workshops design considerations, ecological opportunities and production limitations were considered and incorporated in the final design.